Biorock Monoblock 3-1000 sewage treatment plant installation

Installation of a new Biorock treatment plant system to replace an old cesspit (a sealed tank holding 4000 litres, requiring emptying every 6 weeks).

  • Installation within the old tank due to limited space
  • Empty the old cesspit
  • Excavate soil down to concrete tank surround
  • Break out concrete above tank
  • Cut the top of the tank away
  • Back fill with clean aggregate and lay new concrete pad
  • Install Biorock Monoblock 3-1000 gravity outlet sewage treatment plant within the old tanks position
  • Back fill around new tank with clean 20mm shingle and finish with top soil to required levels .

Other Sewage Treatment Plant Installs

Get in touch to discuss your requirements

Get in touch to learn more about the BIOROCK sewage treatment plants and our installation service for residential households located in Sussex and Kent