Sewage treatment plant installers from survey to completion

A complete installation service for homes across East Sussex, West Sussex and parts of Kent.

We can assess the site, help select and supply a suitable treatment plant, manage the groundworks and complete the installation around the needs of the property.

Treatment plant and excavator arriving at a domestic installation site
One coordinated service Survey · Groundworks · Installation · Maintenance

Complete project support

A complete installation, shaped around the site

The right installation is not simply about placing a tank in the ground. Access, levels, ground conditions, the discharge route and the way the property is used all need to be considered before the work is agreed.

Site survey

We assess the property, access and practical site conditions before recommending the next step.

System selection and supply

We can help choose and supply a sewage treatment plant that fits the property and agreed installation.

Groundworks and installation

Excavation, preparation, connections and the physical installation can be managed as one scope.

Reinstatement and ongoing care

The site can be reinstated as agreed, with servicing and repairs available when needed.

Before excavation begins

A useful plan starts with the property

The survey helps turn an initial enquiry into a practical installation plan. It gives us the information needed to discuss suitable systems, likely groundworks and any site limitations.

Survey arrangements and any charge can be discussed before a visit, particularly where travel or the scope of the assessment needs to be considered.

Ask about a site survey

A clear route through the work

From first conversation to completed system

The exact scope changes from property to property, but the project normally follows four practical stages.

  1. 01

    Discuss the property

    Tell us about the existing arrangements, the problem to solve and where the property is located.

  2. 02

    Survey and recommend

    We assess the site, explain suitable options and agree what should be included in the quotation.

  3. 03

    Prepare and install

    The agreed groundworks, base preparation, treatment plant installation and connections are completed.

  4. 04

    Reinstate and hand over

    The work area is reinstated as agreed and the completed system is explained before ongoing care begins.

What the installation service can include

Excavator preparing the ground for a treatment plant installation
Ground preparation

Excavation and base preparation

Access, excavation and the prepared base are planned around the chosen plant and conditions on site.

01

Existing tank removal

Where appropriate, decommissioning or removal can be coordinated with the replacement installation.

02

Drainage and connections

Pipework and connections can be included within the agreed installation scope.

03

Groundworks

The wider excavation and drainage work can be managed alongside the treatment plant.

04

Reinstatement

The work area can be left ready for its agreed final finish once the installation is complete.

Installation area

Local work across Sussex and nearby Kent

Green Septic Solutions is based in Vines Cross and carries out complete installations across East Sussex, West Sussex and parts of Kent. Availability depends on the postcode and scope of work.

East Sussex West Sussex Parts of Kent Ask about your location

Common questions

Planning an installation

These answers provide a useful starting point. The property and proposed work still need to be discussed before an installation is agreed.

Ask about your property
Can you manage the complete installation?

Yes. The agreed scope can include the site survey, system selection and supply, excavation, base preparation, installation, drainage connections, groundworks and reinstatement.

Can you remove an existing septic tank?

Where appropriate, the decommissioning or removal of an old tank can be discussed as part of the replacement project. The practical approach depends on the existing system and site.

How long does an installation take?

The programme depends on access, ground conditions, the chosen plant and the amount of associated work. We can discuss the likely sequence once the site and requirements are understood.

Can you help choose the treatment plant?

Yes. We can explain suitable product options after considering the household, site conditions, discharge route and maintenance requirements.

Can you maintain the treatment plant after installation?

Yes. Ongoing servicing, maintenance and repairs can be discussed after installation. The appropriate routine depends on the treatment plant, its requirements and how the system is used.

Which areas do you cover?

Complete installations are available across East Sussex, West Sussex and parts of Kent. Please contact us with the property postcode so we can confirm availability.

Discuss your treatment plant installation

Tell us where the property is located, what is already on site and what you are hoping to achieve. We can then discuss the most useful next step.